<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Construction &#8211; Traffix Group</title>
	<atom:link href="https://traffixgroup.com.au/project-category/construction/feed/" rel="self" type="application/rss+xml" />
	<link>https://traffixgroup.com.au</link>
	<description></description>
	<lastBuildDate>Sun, 01 Feb 2026 23:47:28 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://traffixgroup.com.au/wp-content/uploads/traffix-group-favicon-150x150.png</url>
	<title>Construction &#8211; Traffix Group</title>
	<link>https://traffixgroup.com.au</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Melbourne Renewable Energy Hub</title>
		<link>https://traffixgroup.com.au/project/melbourne-renewable-energy-hub/</link>
		
		<dc:creator><![CDATA[Andrew Montgomerie]]></dc:creator>
		<pubDate>Tue, 03 Jun 2025 23:19:48 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=50038</guid>

					<description><![CDATA[The project is for the development of a solar farm and battery energy storage system (BESS) facility. Traffix Group prepared a Traffic Engineering Assessment during the planning approval process and prepared a Traffic Management Plan for the construction stage. We also assisted the client with discussions and negotiations with Council and DTP to gain relevant ... <a title="Melbourne Renewable Energy Hub" class="read-more" href="https://traffixgroup.com.au/project/melbourne-renewable-energy-hub/" aria-label="Read more about Melbourne Renewable Energy Hub">Read more</a>]]></description>
										<content:encoded><![CDATA[
<p>The project is for the development of a solar farm and battery energy storage system (BESS) facility.  </p>



<p>Traffix Group prepared a Traffic Engineering Assessment during the planning approval process and prepared a Traffic Management Plan for the construction stage.</p>



<p>We also assisted the client with discussions and negotiations with Council and DTP to gain relevant agreements for the extent of external road works.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Overtaking Lanes &#8211; Riddoch Highway, Horrocks Highway, and Long Valley Road</title>
		<link>https://traffixgroup.com.au/project/overtaking-lanes-riddoch-highway-horrocks-highway-and-long-valley-road/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 14:31:35 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48609</guid>

					<description><![CDATA[The construction of overtaking lanes on Riddoch Highway, Long Valley Road and Horrocks Highway were part of the $155 million South Australian Rural Roads Safety Package and all of these facilities have been successfully constructed. Traffix Group was engaged to prepare the long-term traffic guidance schemes associated with the delivery of the overtaking lane projects. ... <a title="Overtaking Lanes &#8211; Riddoch Highway, Horrocks Highway, and Long Valley Road" class="read-more" href="https://traffixgroup.com.au/project/overtaking-lanes-riddoch-highway-horrocks-highway-and-long-valley-road/" aria-label="Read more about Overtaking Lanes &#8211; Riddoch Highway, Horrocks Highway, and Long Valley Road">Read more</a>]]></description>
										<content:encoded><![CDATA[
<p>The construction of overtaking lanes on Riddoch Highway, Long Valley Road and Horrocks Highway were part of the $155 million South Australian Rural Roads Safety Package and all of these facilities have been successfully constructed.</p>



<p>Traffix Group was engaged to prepare the long-term traffic guidance schemes associated with the delivery of the overtaking lane projects. By preparing the traffic guidance schemes in CAD format, we were able to undertake a space proofing exercise early in the works to confirm the ability for the staging to be completed under the proposed configuration including identifying any additional measures that assisted in making the delivery phase of the project a success.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tram Grade Separations Project</title>
		<link>https://traffixgroup.com.au/project/tram-grade-separations-project/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 14:29:47 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48607</guid>

					<description><![CDATA[The Tram Grade Separation Project involves the removal of three level crossings along the Glenelg tram line where it crosses Marion Road and Cross Road in Plympton and Morphett Road in Morphetville. Traffix Group was engaged to prepare long-term traffic guidance schemes, design reports and undertake risk assessments for the staging of the works.Preparation of ... <a title="Tram Grade Separations Project" class="read-more" href="https://traffixgroup.com.au/project/tram-grade-separations-project/" aria-label="Read more about Tram Grade Separations Project">Read more</a>]]></description>
										<content:encoded><![CDATA[
<p>The Tram Grade Separation Project involves the removal of three level crossings along the Glenelg tram line where it crosses Marion Road and Cross Road in Plympton and Morphett Road in Morphetville.</p>



<p>Traffix Group was engaged to prepare long-term traffic guidance schemes, design reports and undertake risk assessments for the staging of the works.<br>Preparation of swept path analysis and sight distance checks were undertaken to ensure that the traffic management configurations are appropriate for construction traffic accessing the site while ensuring the road network remains functional during construction activities.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Main South Road Duplication Project</title>
		<link>https://traffixgroup.com.au/project/main-south-road-duplication-project/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 14:27:30 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48605</guid>

					<description><![CDATA[Main South Road Duplication Project has been undertaken in two stages with the duplication between Seaford and Aldinga (MSR1) which is now open to traffic, and between Alidinga and Sellicks Beach (MSR2) which is currently under construction. Traffix Group was engaged to prepare long-term traffic guidance schemes and staging plans for the delivery of the ... <a title="Main South Road Duplication Project" class="read-more" href="https://traffixgroup.com.au/project/main-south-road-duplication-project/" aria-label="Read more about Main South Road Duplication Project">Read more</a>]]></description>
										<content:encoded><![CDATA[
<p>Main South Road Duplication Project has been undertaken in two stages with the duplication between Seaford and Aldinga (MSR1) which is now open to traffic, and between Alidinga and Sellicks Beach (MSR2) which is currently under construction.</p>



<p>Traffix Group was engaged to prepare long-term traffic guidance schemes and staging plans for the delivery of the works including traffic analysis to assess options throughout delivery.<br>The provision of technical and accurate long-term traffic guidance schemes in a CAD format for the complex staging has enabled the works to be setout on site to create a safe environment for all road users and allow the works to be successfully delivered.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Sladen Street</title>
		<link>https://traffixgroup.com.au/project/sladen-street/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 13:19:09 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48561</guid>

					<description><![CDATA[Traffix Group provided various services for this project to ease traffic congestion through Cranbourne’s town centre.]]></description>
										<content:encoded><![CDATA[
<p>Traffix Group provided various services for this project to ease traffic congestion through Cranbourne’s town centre.</p>



<p>Our involvement included conducting surveys, investigations and stakeholder consultation to produce a design to duplicate Sladen Street between High Street and Narre Warren-Cranbourne Road, and upgrade intersections at both ends of the duplication</p>



<p>We liaised closely with VicRoads, the City of Casey and Public Transport Victoria to ensure a successful result.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bayswater</title>
		<link>https://traffixgroup.com.au/project/bayswater/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 13:16:39 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48559</guid>

					<description><![CDATA[Traffix Group had an important road safety role in this $177M project to remove two railway level crossings on Mountain Highway and Scoresby Road in Bayswater.]]></description>
										<content:encoded><![CDATA[
<p>Traffix Group had an important road safety role in this $177M project to remove two railway level crossings on Mountain Highway and Scoresby Road in Bayswater.</p>



<p>Our VicRoads-accredited Senior Road Safety Auditors conducted audits before the roads were re-opened to the public.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Citylink Tulla Widening Project</title>
		<link>https://traffixgroup.com.au/project/citylink-tulla-widening-project/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 13:02:55 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48547</guid>

					<description><![CDATA[Traffix Group provided input to this project to improve traffic flow along 24km of CityLink Tulla between the CityLink tunnels and Melbourne Airport.]]></description>
										<content:encoded><![CDATA[
<p>Traffix Group provided input to this project to improve traffic flow along 24km of CityLink Tulla between the CityLink tunnels and Melbourne Airport.</p>



<p>The project involved replacing the old English Street Bridge in 23 days of around-the-clock construction, adding new lanes, and other measures.</p>



<p>Our work included a detailed traffic impact assessment for the proposed 60-hour closure of the Tullamarine Freeway, and a detailed detour plan with over 40 variable message signs across the surrounding road network.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>FMBH Project</title>
		<link>https://traffixgroup.com.au/project/fmbh-project/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 12:57:46 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48543</guid>

					<description><![CDATA[Traffix Group liaised closely with VicRoads, CPB Contractors and other key stakeholders on this $480M project to remove four railway level crossings and construct three new railway stations.]]></description>
										<content:encoded><![CDATA[
<p>Traffix Group liaised closely with VicRoads, CPB Contractors and other key stakeholders on this $480M project to remove four railway level crossings and construct three new railway stations.</p>



<p>We prepared traffic management plans for all stages of the works, including long-term major road closures during the project.</p>



<p>Our comprehensive traffic management plans incorporated detailed layouts for safety barriers, temporary traffic signals and site access points.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rialto Precinct</title>
		<link>https://traffixgroup.com.au/project/rialto-precinct/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 12:51:28 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48539</guid>

					<description><![CDATA[Traffix Group provided specialist advice during all stages of this $100M project to deliver a new business and lifestyle destination for the Melbourne CBD.]]></description>
										<content:encoded><![CDATA[
<p>Traffix Group provided specialist advice during all stages of this $100M project to deliver a new business and lifestyle destination for the Melbourne CBD.</p>



<p>Our role involved the design of a gantry to protect pedestrians walking past the construction site, and a truck delivery area separate from passing traffic.</p>



<p>We achieved stakeholder approval, which was crucial to the successful delivery of the project, by working closely with the client and stakeholders.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Collingwood</title>
		<link>https://traffixgroup.com.au/project/collingwood/</link>
		
		<dc:creator><![CDATA[Jodie Place]]></dc:creator>
		<pubDate>Sun, 30 Mar 2025 11:33:30 +0000</pubDate>
				<guid isPermaLink="false">https://traffixgroup.com.au/?post_type=project&#038;p=48499</guid>

					<description><![CDATA[This project was a consequence of Traffix Group’s review of pedestrian movements through the local area during the Gold Precinct Local Area Traffic Management Study.]]></description>
										<content:encoded><![CDATA[
<p>This project was a consequence of Traffix Group’s review of pedestrian movements through the local area during the Gold Precinct Local Area Traffic Management Study.</p>



<p>Our role included a detailed design of the signals, including a traffic signal plan. It also involved consultation with PTV to ensure that the proposed pedestrian-operated traffic signals would not adversely affect tram services, and that the signals location allowed for future upgrades to tram stops along Smith Street.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
