The project is for the development of a solar farm and battery energy storage system (BESS) facility. Traffix Group prepared a Traffic Engineering Assessment during the planning approval process and prepared a Traffic Management Plan for the construction stage. We also assisted the client with discussions and negotiations with Council and DTP to gain relevant … Read more
Service Category: Infrastructure/ Construction
The project involves the internal refurbishment of the 150 Charlotte Street building. Traffix Group was engaged to prepare detailed swept path diagrams for truck access to and from basement car park to determine the largest size vehicle to be able to access the site. This information was used to inform the overall construction methodology.
Traffix Group worked closely with Built to undertake a pedestrian safety review of one of the main vehicle and pedestrian access roads to the hospital that will be shared with construction traffic during the $619 million hospital expansion works. The review included detailed site inspections, adopting a Road Safety Audit methodology, to idtentify safety risks … Read more
The construction of overtaking lanes on Riddoch Highway, Long Valley Road and Horrocks Highway were part of the $155 million South Australian Rural Roads Safety Package and all of these facilities have been successfully constructed. Traffix Group was engaged to prepare the long-term traffic guidance schemes associated with the delivery of the overtaking lane projects. … Read more
The Tram Grade Separation Project involves the removal of three level crossings along the Glenelg tram line where it crosses Marion Road and Cross Road in Plympton and Morphett Road in Morphetville. Traffix Group was engaged to prepare long-term traffic guidance schemes, design reports and undertake risk assessments for the staging of the works.Preparation of … Read more
Main South Road Duplication Project has been undertaken in two stages with the duplication between Seaford and Aldinga (MSR1) which is now open to traffic, and between Alidinga and Sellicks Beach (MSR2) which is currently under construction. Traffix Group was engaged to prepare long-term traffic guidance schemes and staging plans for the delivery of the … Read more