Traffix Group assisted Goulburn Murray Water with the preparation of an Oversized Load Mangement Strategy for Sugarloaf Road, Eildon. The project team developed a strategy to manage the transport of Houseboats along a section of public road near Lake Eildon, with a strong focus on the uniqueness of the frequent transport of oversized loads a … Read more
Service Category: Transport Planning
Traffix Group partnered with BMT and Better Boating Victoria to provide traffic engineering design assistance for the carparking and boat ramp expansion at Werribee South Boat Ramp. Our involvement included the development of a revised carparking layout, conduct of vehicle swept path assessments, consideration for multiple car parking options and improvements to signage and linemarking.
Traffix Group partnered with Kingston City Council to provide traffic engineering design assistance for the redeveloped Mentone Life Saving Club. Our involvement included the development of a vehilce access ramp to the beach for life saving vehicles and beach cleaning machinery, and included vehicle specific ground clearance assessments. Works also included the treatment of the … Read more
Traffix Group partnered with Melton City Council to prepare a number of funding applications for the Federal Government Black Spot program. Our role involved the investigation of comprehensive crash data, development of treatments to reduce future crashes from occuring and the preparation of concept level designs and other supporting documentation. Given the limited project timeframe, … Read more
Traffix Group have conducted several reviews of traffic management operations at the iconic South Melbourne Market, including reviewing forklift and loading operations, and car parking and vehicle access. A review of the existing operations was conducted, with traffic management plans produced to include recommended treatments for the differing operational characteristics of market and non-market days.
Traffix Group conducted a road safety study for the Clifton Hill and North Abbotsford study area within the City of Yarra. The study developed innovative proposals to address potential road safety issues associated with through traffic, current cycling conditions and prioritise pedestrian movements in the area. The project also included several rounds of community and … Read more
Traffix Group conducted traffic management reviews and planning for 16 Major Water Storages operated by Goulburn Murray Water across Victoria. As part of this project, we visited 85 individual public recreational areas, assessing the existing traffic management arrangements, collborating with local staff and preparing a site specific traffic management plan for each site. Each traffic … Read more
Traffix Group successfully assisted Moonee Valley City Council with the development and delivery of a Local Area Traffic Management study for its Newmarket precinct. The study developed innovative proposals to manage through traffic, improve cycling conditions and prioritise pedestrian movements in the precinct, in addition to the preparation of an extensive parking management plan. Our … Read more
The Albury Sailors, Soldiers and Airmens Club (SS&A) project includes new Wintergarden and Summer House dining area expansions and changes to the existing carpark including improvements to carpark circulation and pedestrian access. Traffix Group provided design advice, undertook assessments under the provisions of the Albury Development Control Plan and provided a Traffic Engineering Assessment Report … Read more
The Skylands Masterplan provides for over 2,500 new dwellings within six walkable neighbourhoods on the Tranmere-Rokeby peninsula on the River Derwent. Traffix Group undertook a high-level strategic traffic engineering assessment, identyfying traffic and access impacts, opporunities and constraints.