The project involves the internal refurbishment of the 150 Charlotte Street building. Traffix Group was engaged to prepare detailed swept path diagrams for truck access to and from basement car park to determine the largest size vehicle to be able to access the site. This information was used to inform the overall construction methodology.

Traffix Group worked closely with Built to undertake a pedestrian safety review of one of the main vehicle and pedestrian access roads to the hospital that will be shared with construction traffic during the $619 million hospital expansion works. The review included detailed site inspections, adopting a Road Safety Audit methodology, to idtentify safety risks … Read more

Traffix Group assisted Cleanaway with revising the internal traffic flow of their Pinkenba Transfer Station, to provide improvements to the safety and efficiency of the facility. This included extensive electronic swept path analysis and transport engineering advice to incorporate the vision of the client within their facility.

Traffix Group were engaged to provide a traffic engineering review of a proposed hand car wash within the basement car parking area of the existing Maroochydore Homemaker Centre (The Centre) at 11-55 Maroochy Boulevard, Maroochydore. The additional use resulted in a reduction in car parking for the existing uses at the site. Accordingly, an assessment … Read more

Traffix Group were engaged by Castlerock Property Developments Pty Ltd to undertake a traffic engineering assessment for a proposed commercial development at 158-186 Walker Street, Townsville. A detailed review and design advice of the proposed car parking and bicycle layout and vehicle access arrangements was provided to satisfy the relevant standards and statutory requirements. A … Read more